Plant Turnaround & Shutdown Planning Kit
A ready-to-use system to plan a plant turnaround, shutdown or outage, from the T-minus milestone plan to the close-out report.
$29 one-time payment, instant download
Delivered as an instant PDF/XLSX/DOCX download (one ZIP file, available right after checkout). 60-day money-back guarantee, handled by Digistore24.
What it does
Most turnaround overruns come from the same causes: late scope, long-lead items ordered too late, thin work packs and no daily control rhythm. This kit gives you the templates and guidance to plan and control the event.
What's included
- Planning guide (PDF, 8 pages): T-minus milestones, scope challenge and freeze, work packs, scheduling, RACI, risk, readiness reviews, daily control and KPIs
- 12-sheet Excel workbook: setup, dashboard, milestone plan, scope register, auto-drawing Gantt, RACI with checks, risk register, budget tracker, manpower histogram, S-curve, lessons learned
- Word forms pack: scope challenge, late scope request, go/no-go readiness review, daily status and close-out report
- No macros; works in Excel and Google Sheets; example data included